How to build a fab? Quickly?

No Permits, No Fabs – Semi-Literate

In part because of the unique infrastructure requirements of fabs and the regulatory processes these large construction projects must navigate, construction of semiconductor fabs takes several years. Between 1990 and 2020 there were approximately 635 greenfield semiconductor fabs built around the world. The average time between the construction start date and the beginning date of production was 682 days or roughly 1.86 years. This timeline does not include pre-permitting and pre-construction considerations, indicating that fab construction times exceed two years on average.

This is a fascinating insight into the scope of the problem. Why is it difficult to build a fab “quickly”?

Fabs have extensive infrastructure requirements, which interact with federal, state, and local regulations in complex ways. Modern fabs require access to: (1) large plots of (2) seismically inactive land with a reliable, affordable, and stable supply of (3) water, (4) electricity, (5) talent, (6) transportation infrastructure, and (7) nearby land for co-locating with suppliers essential for constructing and operating a modern fab.

There’s much more to it. I am referring to a dry policy document here:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.